1
    
      2
    
      3
    
      4
    
      5
    
      6
    
      7
    
  
  
   
       
       
       
       
       
       
      RedBridge Museum
Timeline: 8 months
Client: Redbridge Museum
Value: £20k
Aim: To produce a collection of exhibits as part of the redevelopment of the museum , all of the exhibits are hands and low maintenance 
What we did: Working with the clients designer we developed 7 interactives and installed them in the new museum